Workload Mobility and Disaster Recovery : Designing the Solution : 4.8 Failure Scenarios : 4.8.1 Complete Site Failure
   
4.8.1 Complete Site Failure
In the event that a whole site fails, the recovery steps are as follows:
1. Virtual machines are recovered leveraging Site Recovery Manager.
2. The secondary NSX Manager is promoted to the primary manager.
3. NSX Controller nodes are redeployed in the recovery site.
4. Normal operations resume.